Sony Highway Project



The package commences from Ch 91500 and terminate at Ch 98000, running in the north-south direction. Its covers a distance of 6.5 km in Mukim Rasau, Dungun. The terrain can generally be described as flat, undulating and rugged at the various sections. The proposed highway is a two-lane dual carriageway with each carriageway varying from 2.75 m to 3.25 m with laterite/hard shoulder. There are 3 Nos bridges and several major culverts and a VBC in this package. Scheduled for completion towards end of 2010, the highway will shortened journey time from Kuala Lumpur to Kuala Terengganu beside providing efficiency and safety to road users.