The Seri Wawasan Bridge is one of the main bridges in Putrajaya, the Malaysian federal administrative capital. This futuristic cable-stayed bridge which has a sail ship appearance, connects Precinct 2 on the Core Island to the residential area of Precinct 8.
The concrete bridge is a combination of cable backstays and structural steel tie back. It is a dual three lane carriageways of 18.6m width each, comprising 3 x 3.5m width lanes, 0.5 m hard shoulder, 0.5m marginal strip. The median is 4 m wide and walkway cum cycle track width is 5.1m giving a total width of 37.2m at the centre of the bridge.
No comments:
Post a Comment